Work Hours and Schedule: between 10PM-10AM (night shift) work hours, 4hrs or 8hrs per day, SCHEDULE WILL BE CHOSEN BY THE CLIENT. Part-time hours: 20 per week. . DAY SHIFT (noun) The noun DAY SHIFT has 2 senses: 1. The work shift during the day (as 8 a.m. Workers who work during the day (as 8 a.m. Shift Schedule #2. D12 = 12-hour day shift, N12 = 12-hour night shift – = Day off (Full weekends are highlighted) This shift schedule is a sixteen-week cycle staffed by four equal crews. Each crew is assigned to start their schedule in a different week in the cycle as shown above.
The DuPont schedule follows a 12-hour rotating shift pattern that uses 4 teams (crews) and 2 twelve-hour shifts to provide 24/7 coverage. During a 4-week cycle, each team works 4 consecutive night shifts, followed by 3 days off duty, works 3 consecutive day shifts, followed by 1 day off duty, works 3 consecutive night shifts, followed by 3 days off duty, works 4 consecutive day shift, then have 7 consecutive days off duty. Personnel works an average 42 hours per week.
DuPont schedule 12-hour rotating shift schedule example:
Week | Mon | Tue | Wed | Thu | Fri | Sat | Sun |
---|---|---|---|---|---|---|---|
1 | Night | Night | Night | Night | Off | Off | Off |
2 | Day | Day | Day | Off | Night | Night | Night |
3 | Off | Off | Off | Day | Day | Day | Day |
4 | Off | Off | Off | Off | Off | Off | Off |
As shown above, each 4 week cycle comes with 7 consecutive days off. This DuPont schedule is very popular because employees have a long resting period, spending time with their families or doing recreational activities. But transition between the day oriented circadian physiology and the requirement for work and sleep at the “wrong” biological time of day may cause sleep loss, fatigue, and shift work disorder.
When emergencies arise and an employee needs to take a few days off, it can be a challenge finding a replacement to ensure adequate shift coverage while taking into consideration time-off constraints, union, labor and overtime rules, employee availability, skills, preferences, etc. Snap Schedule 365 employee scheduling software solves these challenges and help companies build smarter schedules, avoid unnecessary overtime, and always know who is working where and when. Get your free trial now.
Notes:
The above grid shows working and non-working days for each team in one repeat cycle. Day 1 usually starts on a Monday but it can be any day of the week. At the end of the cycle, the entire sequence starts over. Color coded blocks represent assigned shifts (working days) while underlines represent non-working days.- The required shifts and shift lengths are shown in the Shifts column. Shift names, start times, and end times are shown as examples only. They can be changed to match the requirements of your operation.
- The teams required by the plan are shown in the first column. The total working hours for each team over the repeat cycle are shown in the Hours column, assuming one employee per team.
- The last row, Hours, shows the hours worked by all teams in each date range block (leg), assuming one employee per team.
Characteristics | |
Plan ID | C4TR12-3 |
---|---|
Name | DuPont Shift Schedule |
Applicability | 24/7 operations |
Teams Required | 4 |
Shifts | 12-hr |
Repeat Cycle | 28 days |
Rotation | Slow rotation between day and night shifts |
Average Hours per Week | 42 |
Staffing Fluctuation | Balanced from shift to shift and day to day |
Pluses |
|
Minuses |
|
Common Usage | Used in several manufacturing industries and police departments in the United States |
Notes |
Definitions:
- Plan ID: A code used to uniquely identify the shift plan in Snap Schedule employee scheduling software.
- Name: The name of the shift plan.
- Applicability: The type of operations this shift configuration is designed for.
- Teams Required: The number of teams (crews) required by this plan. A team may consist of one or more employees.
- Shifts: The different shifts used in this shift pattern. For each shift, only the shift description and shift length are shown. The shift start or end time can be adjusted to fit your business operations so long as the shift length stays the same.
- Repeat Cycle: The number of days required for each team to complete its assigned shift sequence in a schedule plan. At the end of each repeat cycle, the team starts the same shift sequence over again.
- Rotation: For rotating shift configurations, a team rotates from one shift to another according to a specific arrangement. In a forward rotation, the team rotates from a shift that starts earlier in the day to a shift that starts later in the day, e.g. Day to Swing to Night. In a backward rotation, the reverse is true. Many studies suggest that forward rotation is better than backward rotation since our body adjusts much better to changes in work shifts from earlier to later. The rotation speed is the speed at which the shifts are rotated. In a 'fast' rotation, a team rotates from one shift to another once every few days or less. In a 'slow' rotation, a team works the same shift for many days or weeks before rotating to another shift.
- Average Hours Per Week: This is the average number of hours worked by each employee per week based on the shift lengths and shift sequences for this plan.
- Staffing Fluctuation: The fluctuation in staffing level as the plan progresses from shift to shift and day to day. A shift configration is 'balanced from shift to shift' if the new shift will be staffed by the same number of employees as the old shift. A shift configuration is 'balanced from day to day' if each day is staffed by the same number of employees. Note that by default, each team contains the same number of employees.
- Pluses: Positive aspects of the shift configuration.
- Minuses: Negative aspects of the shift configuration.
- Common Usage: Typical users of the shift configuration.
If you work a rotation that involves multiple shifts and follows a specific pattern, you can use this spreadsheet to create your yearly work schedule. It allows you to include up to 3 shifts in your rotation pattern (day/evening/night, day/night, 1/2/3, A/B/C, etc.)
Download
⤓ Excel (.xlsx)⤓ Google SheetsDay Shift Netflix
License: Private Use (not for distribution or resale)
'No installation, no macros - just a simple spreadsheet' - by Jon Wittwer
Description
This template allows shift workers to create a yearly work calendar by defining a rotation pattern and a start date. The work days are highlighted automatically in the yearly calendar using a technique known as Conditional Formatting.
This spreadsheet was designed based on the Rotation Schedule template, which does basically the same thing except shown in a different type of calendar layout.
Day Shift At Freddy
Defining a Shift Rotation Pattern
The shift rotation is defined as a pattern of letters or numbers consisting of 'x' for days off and either a number or letter to indicate which shift you are working. The letter or number for each shift is defined in the legend above the calendar. You can change the legend to match what you want to use in your pattern.
This spreadsheet was designed to display the work calendar for a single employee or team. However, you can duplicate the worksheet to set up calendars for different employees or teams.
For example, the pattern 'DDDDxxNNNNxxxx' would mean working 4 days in a row on the day shift (D), followed by 2 days off, followed by 4 days in a row on the night shift (N), followed by 4 days off.
In addition to the pattern, you need to enter the date that the pattern starts.
Holidays and Non-Working Days
If you want the rotation pattern to skip holidays and weekends (the spreadsheet refers to these as 'non-working days') then you can select the option that works for you from a drop down at the top of the worksheet. By default, the 'Non-Working Days' option is set to 'none.'
Day Shift Rn
You can edit the list of holidays via the Holidays worksheet. If you select any option from the drop-down list other than 'none' the holidays will be included as non-working days. If you don't want to include holidays, you can delete the holidays from the list in the Holidays worksheet (see the instructions in that worksheet).